پرش به محتوا
افتخار می‌کنیم که از سال ۱۹۶۴ مالکیت و اداره کانادایی داشته‌ایم.
افتخار می‌کنیم که از سال ۱۹۶۴ مالکیت و اداره کانادایی داشته‌ایم.

Huber ZIP System Wall & Roof Sheathing - 7/16, 1/2 & 5/8 in.

SKU 820321001-Special Order
قیمت اصلی $57.07 - قیمت اصلی $3,760.00
قیمت اصلی
$57.07
$57.07 - $3,760.00
قیمت فعلی $57.07

Prices shown are online prices.

Special order · ready in 1–3 business days

Size: 7/16 in. x 4 ft x 8 ft
Quantity: Single Sheet

Delivery Options

Special order · Order today, ready in 1–3 business days

  • Pickup at Griff Warehouse

    Free · ready in 1–3 business days · Get directions

  • Parcel shipping not available

    Too large for parcel. Choose pickup or truck.

  • Truck delivery available

    Flat deck or Hiab crane · Lower Mainland & Fraser Valley · 1–3 business days

Special order: non-returnable, or a restocking fee may apply.

Exact delivery rate is calculated at checkout.

Questions about this product?Talk to a Griff pro: 604-521-6691 · shop@griff.ca

First-Time User Rebate: $7 per panel back on up to 250 panels of ZIP System 7/16, 1/2 or 5/8 in. sheathing, on purchases made Jan 1 – Dec 31, 2026.
First-time users only. For qualifying building companies (not homeowners); registration and invoices required.

ZIP System Wall and Roof Sheathing

ZIP System sheathing is a Structural 1 rated OSB panel with a water-resistive barrier and air barrier bonded to the face at the mill. Hang the panels, tape every seam with ZIP System flashing tape, and the wall or roof is dried in without housewrap or felt.

Sold by the single sheet for small jobs and repairs, or by the full manufacturer lift for framing packages. Lift counts: 80 sheets for 7/16 in. 4 x 8, 60 sheets for 7/16 in. 4 x 10, 70 sheets for 1/2 in. and 55 sheets for 5/8 in.

Features and Common Uses
  • Integrated water-resistive barrier replaces housewrap and roofing felt
  • Continuous rigid air barrier once the seams are taped
  • WRB layer vapour permeance of 12 to 16 perms, so the wall can still dry
  • Structural 1 span ratings for wall bracing and roof decking
  • 180-day Exposure Guarantee, so the frame can stand open through a wet season
  • 30-Year Limited Warranty when installed with ZIP System flashing tape

Commonly used for:

  • Exterior wall sheathing on wood-framed houses and multifamily
  • Roof decking under shingles, metal or tile
  • 7/16 in. x 4 x 10 long length panels for 9 ft walls with fewer horizontal seams
  • 1/2 and 5/8 in. panels for wider rafter spacing and higher shear walls
Specifications
ZIP System Sheathing Sizes
Panel Span Rating Sheets per Lift
7/16 in. x 4 ft x 8 ft 24/16, Structural 1 80
7/16 in. x 4 ft x 10 ft 24/16, Structural 1 60
1/2 in. x 4 ft x 8 ft 32/16, Structural 1 70
5/8 in. x 4 ft x 8 ft 40/20, Structural 1 55

Span ratings, panel counts and air and water performance are from Huber's ZIP System wall sheathing page and architect brochure. Fastening schedules depend on framing, wind exposure and code; confirm them in the installation manual. Source: ZIP System Wall and Roof Installation Manual (PDF).

What Else You Need

Every panel seam must be taped for the barrier and the warranty to work. Huber's rule of thumb is one roll of 3-3/4 in. ZIP System flashing tape for about 7 sheets of 4 x 8 sheathing. Use ZIP System stretch tape or liquid flash around window sills, corners and penetrations, and roll all tape firmly with the ZIP System tape roller.

How to Install
  1. Install panels with the printed face out, 1/8 in. gap at all edges, and fasten to the schedule for your framing and wind exposure.
  2. Tape every vertical and horizontal seam with ZIP System flashing tape, working bottom to top so upper tape laps over lower.
  3. Roll all tape firmly with a ZIP System tape roller to activate the acrylic adhesive and remove wrinkles.
  4. Flash window and door rough openings with ZIP System stretch tape or liquid flash before installing the unit.

Full nailing schedules, opening flashing sequences and roof details: Source: ZIP System Wall and Roof Installation Manual (PDF).

Frequently Asked Questions
Do I still need housewrap?

No. The water-resistive barrier is built into the panel face. Tape every seam with ZIP System flashing tape and the wall is dried in.

How many sheets are in a full lift?

80 for 7/16 in. 4 x 8, 60 for 7/16 in. 4 x 10, 70 for 1/2 in. and 55 for 5/8 in. A full lift is priced lower per sheet than single sheets.

How much tape do I need?

About one 90 ft roll of 3-3/4 in. ZIP System flashing tape per 7 sheets of 4 x 8. Openings and corners add to that.

Which thickness should I use on the roof?

7/16 in. is rated 24/16, 1/2 in. is rated 32/16 and 5/8 in. is rated 40/20. Match the span rating to your rafter or truss spacing and the roofing load.